Internal Document  ·  Production

K&Z Production Window

Scheduling Standards  ·  Production Department

K&Z operates on an 8-week production window, which begins from the confirmed ship date. This period allows adequate time for material ordering and cabinet production. Two weeks before the scheduled shipping date, the Project Manager must confirm and finalize the shipping arrangements. In the final week before delivery, the Project Manager is responsible for verifying that the jobsite is fully prepared to receive the shipment, ensuring a smooth delivery process.

8

Week Production Window

Begins from the confirmed ship date — covering material ordering and full cabinet production through to delivery.

8 wks out
Production Start
  • Order materials
  • Begin cabinet production
2 wks out
PM Checkpoint
  • Confirm ship date
  • Finalize arrangements
1 wk out
PM Checkpoint
  • Verify jobsite readiness
  • Confirm delivery logistics
Ship date
Delivery
  • Cabinets delivered to jobsite
Production Timeline Outline
I
Total Production Window
  • Duration 8 Weeks total
  • A Material Ordering
  • B Cabinet Production
II
Project Manager Checkpoints
  • A  ·  2 weeks before Shipping Confirmation
    • Finalize ship date
    • Confirm arrangements
  • B  ·  1 week before Jobsite Verification
    • Verify jobsite readiness
    • Confirm delivery logistics
Time from Ship Date Action Required
8 weeks before Production Start production window — order materials and begin cabinet production
2 weeks before PM Project Manager confirms ship date and finalizes logistics
1 week before PM Project Manager verifies jobsite readiness and confirms delivery
Ship Date Delivery Cabinets delivered to jobsite